PROJECT

The Coastal Virginia Offshore

The first was the 30MW Block Island Wind Farm, commissioned in 2016 at 3 kilometres off the coast of Rhode Island. The Coastal Virginia wind farm contains the very first offshore wind turbines in U.S. Federal Waters.

Ørsted Wind Power North America LLC selected Jan De Nul Group to install a 12MW demonstrator Offshore Wind Farm, 27 miles off the coast of Virginia. The scope for Komarine included the transport and installation of both offshore foundations and wind turbines, as well as the procurement and installation of the scour protection.

Jan De Nul’s offshore jack-up installation vessel Vole au vent delivered the installation works and was assisted by the multipurpose vessel Adhémar de Saint Venant to perform the scour protection works.

Anse Du Portier, Monaco

This large construction project in Monaco started in 2016 which consisted of the development of a recreational and housing extension of the principality in Monaco. Since the start of the project over 10 construction vessels from Jan De Nul have been mobilised to this project to dredge the polluted and non-polluted soils, to install a huge rock berm and to reclaim the area with sand material.

The foundation of the caisson construction was installed by the ‘Simon Stevin’ which installed a record breaking 1,446,000 tonnes of rock material in one rock berm with an incredible height of more than 30 m. Once the foundation was completed the caissons were installed on top by Bouygues and the ‘Daniel Bernoulli’ which is equipped with a conveyor belt on the aft of the vessel was mobilized to the project. The conveyor belt was used to stabilize the caissons and to install rock material behind the caissons.

Gunfleet Sands, United Kingdom

Gunfleets Sands OWF is a 172 MW wind farm about 7 km off the coast in south of the United Kingdom. The OWF was constructed by Dong (now Orsted) between 2008 and 2010. The field is located in very shallow water depth ranging from 2 m to 15 m LAT and the large tidal range on site created more scouring around the monopiles than expected.

After a couple of surveys in the years after completion it became clear that the cables connected to the turbines were free spanning more than intended due to the scouring effect which created a larger whole around the monopiles. To mitigate this both the ‘Simon Stevin’ and the ‘Tiger’ were mobilized to install rock material around these monopiles. The ‘Simon Stevin’ was used as a supply vessel to make it possible for the shallower ‘Tiger’ to install rock material on high tide even on the shallowest locations. Over 50,000 tonnes were installed in one campaign in 2014.

Jindo Jeju, South Korea

Two submarine cables with a length of over 100 km have been installed between the island of Jindo and the island of Jeju, located in the south of South Korea. The cables required rock protection for about 30 % of the route for which the ‘Joseph Plateau’ was mobilized in the summer of 2019.

The rock berms had a different length and height depending on the water depth (ranging from 27 m till 157 m) and the expected current at the rock berm location on the cable route. A total of 370,000 tonnes of rock have been installed in 12 trips in less than 3 months. Rock loading was performed in a nearby harbour with local sourced rock which was loaded on board of our vessel by using the vessel specifically designed conveyor belts.

Wheatstone Platform, Australia

In 2014 and 2015 the Joseph Plateau was mobilized to Australia to perform rock blanket installation, solid ballasting and scour protection services for the chevron-operated Wheatstone platform.

Prior to installation of the platform a rock blanket was installed within a tolerance of +/- 50 mm  on a water depth of 70 m. The rock blanket had the size of approximately two football fields (over 30,000 tonnes of rock). On this rock blanket the platform was installed and the ballasting of 110,000 tonnes of iron ore was performed by the same vessel by use production and pumping units on the aft of the vessel. After solid ballasting, the scour protection was installed by means of armour rock and mattresses.

Offshore Windfarm Borkum Riffgrund 2

For the Borkum Riffgrund 2 wind farm in Germany, Jan De Nul Group were contracted by Ørsted to install 36 monopiles and couplings. In addition, we took care of the supply, transport and installation of riprap protecting the foundations against erosion.

The Borkum Riffgrund 2 offshore wind farm I l is located within the German North Sea Exclusive Economic Zone (EEZ), 17 km east of the Dutch border, 34 km north of the island of Borkum and 50 km north-east of the German mainland. The wind farm is connected to the German grid with a capacity of 450 MW. For the installation of the foundations, Jan De Nul Group deployed the jack-up installation vessel Vole au vent.

Offshore Wind Farm Nobelwind, Belgium

Off the Belgian coast in the North Sea, Jan De Nul Group built the 165 MW Nobelwind park, contracted by Nobelwind, with Parkwind NV as main shareholder. It was the first wind contract for our installation vessel Vole au vent. Construction started in 2016, and the final handover of the wind farm happened in October 2017.

For Jan De Nul Group, Nobelwind is an EPCI project: we take care of designing, purchasing, building and installing the 51 pile foundations for 50 wind turbines and the Offshore High Voltage Substation (OHVS), erosion prevention riprap around the foundations and installation of the 50 wind turbines. The wind turbines are located on the Bligh Bank sand bar, next to the Belwind wind farm. The wind farm is located approximately 45 kilometres off the coast at Oostende and has a capacity of 165 MW, sufficient to power 186,000 households with green energy.